SAI-EQ-40
Division 5 to 10: Plant Utilities, Cold Chain, QA Lab, IT & Coding
OPEN
SAI-EQ-40 — Cleanroom Environmental IoT Telemetry, Air Quality & Differential Pressure Monitor Matrix
📍 Destination: Sarangpur Cleanroom Hub & Nayagaon Bay, Chandigarh Tricity
⚖️ Capacity: Multi-zone wall-mount IoT telemetry matrix (12 sensor nodes) logging temperature, RH, differential pressure & PM2.5/PM10
🚀 Phase: Phase 1 (Day-1)
⏳ Deadline: Rolling Procurement • Active 2026 Lot
💡
ADDITIONAL INFO (FLEXIBLE PARAMETERS & VENDOR ALTERNATIVES)
Sensor nodes communicate over Modbus RTU or industrial Wi-Fi to the local LLM/ERP server (SAI-EQ-39). Real-time cleanroom temperature (target: 20-22°C) and pressure (+15 Pa) data streams directly to public customer verification dashboard.
🔬
REGULATORY & QUALITY SPECIFICATION BENCHMARK
Factory-calibrated digital sensors; 21 CFR Part 11 compliant audit trail; real-time telemetry streaming to local ERP and /verify-batch/
Comprehensive Technical & Commercial Specifications
| Asset / Item Code | SAI-EQ-40 |
|---|---|
| Department / Division | Division 5 to 10: Plant Utilities, Cold Chain, QA Lab, IT & Coding |
| Technical Capacity | Multi-zone wall-mount IoT telemetry matrix (12 sensor nodes) logging temperature, RH, differential pressure & PM2.5/PM10 |
| Metallurgy & Material | IP65 wipe-down sanitary polycarbonate and SS-304 wall-plate enclosures, RS485 Modbus / MQTT protocol |
| Power / Drive Rating | 0.15 kW (Central 24V DC industrial power supply with battery backup) |
| Deployment Phase | Phase 1 (Day-1) |
| Quality Standard | Factory-calibrated digital sensors; 21 CFR Part 11 compliant audit trail; real-time telemetry streaming to local ERP and /verify-batch/ |
| Delivery Destination | Sarangpur Industrial Cluster, Chandigarh – 160014 |
| Payment Milestone | 30% Advance | 40% Live FAT | 20% Physical Delivery | 10% Final SAT Retention |
| Commercial Guarantee | 12-Month Comprehensive Guarantee + 24-Month Critical Spares Commitment |
Commercial Terms & Settlement Milestone Structure
- 30% Advance upon formal purchase order release & engineering drawing approval
- 40% Milestone Release upon successful live Factory Acceptance Test (FAT) under full operational load
- 20% Milestone Release upon physical site delivery at Sarangpur Industrial Cluster, Chandigarh
- 10% Final Retention released post-SAT commissioning and continuous 7-day trial run
- Mandatory 12-Month Comprehensive Guarantee + 24-Month Critical Spares commitment
DIRECT ITEM TENDER
Quote for SAI-EQ-40
Submit your commercial proposal directly to the Directorate of Procurement.
Need urgent technical clarification? WhatsApp us directly at +917696788811