📢
MANDATORY QUOTATION REQUIREMENT: When quoting for this item, your quotation document must clearly display the code SAI-EQ-23 in BOLD.
SAI-EQ-23 Division 5 to 10: Plant Utilities, Cold Chain, QA Lab, IT & Coding
OPEN

SAI-EQ-23 — Custom Solar Eutectic EV Cargo Vans (8)

📍 Destination: Sarangpur Cleanroom Hub & Nayagaon Bay, Chandigarh Tricity
⚖️ Capacity: L5N electric cargo chassis, 700W rooftop solar array, -20°C eutectic plates
🚀 Phase: Phased (2 to 8)
⏳ Deadline: Rolling Procurement • Active 2026 Lot
💡 ADDITIONAL INFO (FLEXIBLE PARAMETERS & VENDOR ALTERNATIVES)
Open to OEM retrofitted or purpose-built electric 3-wheeler (L5N) or 4-wheeler mini trucks (e.g., Tata Ace EV, Mahindra Zor, Piaggio Ape E-City). Passive eutectic plates eliminate generator noise and ensure clean fulfillment.
🔬 REGULATORY & QUALITY SPECIFICATION BENCHMARK
Zero tailpipe emissions; certified cold-chain hold at 2°C-8°C for dairy and -18°C for momos

Comprehensive Technical & Commercial Specifications

Asset / Item Code SAI-EQ-23
Department / Division Division 5 to 10: Plant Utilities, Cold Chain, QA Lab, IT & Coding
Technical Capacity L5N electric cargo chassis, 700W rooftop solar array, -20°C eutectic plates
Metallurgy & Material Food-grade fiberglass interior lining, 14-hr passive cooling holding
Power / Drive Rating 0.0 kW (Electric vehicle chassis with solar replenishment)
Deployment Phase Phased (2 to 8)
Quality Standard Zero tailpipe emissions; certified cold-chain hold at 2°C-8°C for dairy and -18°C for momos
Delivery Destination Sarangpur Industrial Cluster, Chandigarh – 160014
Payment Milestone 30% Advance | 40% Live FAT | 20% Physical Delivery | 10% Final SAT Retention
Commercial Guarantee 12-Month Comprehensive Guarantee + 24-Month Critical Spares Commitment

Commercial Terms & Settlement Milestone Structure

  • 30% Advance upon formal purchase order release & engineering drawing approval
  • 40% Milestone Release upon successful live Factory Acceptance Test (FAT) under full operational load
  • 20% Milestone Release upon physical site delivery at Sarangpur Industrial Cluster, Chandigarh
  • 10% Final Retention released post-SAT commissioning and continuous 7-day trial run
  • Mandatory 12-Month Comprehensive Guarantee + 24-Month Critical Spares commitment
DIRECT ITEM TENDER

Quote for SAI-EQ-23

Submit your commercial proposal directly to the Directorate of Procurement.

Need urgent technical clarification? WhatsApp us directly at +917696788811