SAI-EQ-37
Division 5 to 10: Plant Utilities, Cold Chain, QA Lab, IT & Coding
OPEN
SAI-EQ-37 — Semi-Auto Shrink Tunnel & Tamper-Evident Heat Sealer
📍 Destination: Sarangpur Cleanroom Hub & Nayagaon Bay, Chandigarh Tricity
⚖️ Capacity: Continuous motorized conveyor shrink tunnel (30-50 bottles/min) for tamper-evident neck bands
🚀 Phase: Phase 1 (Day-1)
⏳ Deadline: Rolling Procurement • Active 2026 Lot
💡
ADDITIONAL INFO (FLEXIBLE PARAMETERS & VENDOR ALTERNATIVES)
Open to tabletop or standalone tunnel models. Tunnel chamber dimensions min. 800mm x 250mm x 200mm. Must provide uniform 360-degree heat shrinkage without scorching BOPP label paper or overheating cold-pressed oil bottle contents.
🔬
REGULATORY & QUALITY SPECIFICATION BENCHMARK
Accurate digital temperature control up to 200°C; variable conveyor speed; handles PVC/PET/OPS shrink sleeves on amber glass bottles
Comprehensive Technical & Commercial Specifications
| Asset / Item Code | SAI-EQ-37 |
|---|---|
| Department / Division | Division 5 to 10: Plant Utilities, Cold Chain, QA Lab, IT & Coding |
| Technical Capacity | Continuous motorized conveyor shrink tunnel (30-50 bottles/min) for tamper-evident neck bands |
| Metallurgy & Material | SS-304 conveyor mesh and outer housing, quartz infrared heating tubes |
| Power / Drive Rating | 4.5 kW (PID regulated infrared heater + blower fan + conveyor motor) |
| Deployment Phase | Phase 1 (Day-1) |
| Quality Standard | Accurate digital temperature control up to 200°C; variable conveyor speed; handles PVC/PET/OPS shrink sleeves on amber glass bottles |
| Delivery Destination | Sarangpur Industrial Cluster, Chandigarh – 160014 |
| Payment Milestone | 30% Advance | 40% Live FAT | 20% Physical Delivery | 10% Final SAT Retention |
| Commercial Guarantee | 12-Month Comprehensive Guarantee + 24-Month Critical Spares Commitment |
Commercial Terms & Settlement Milestone Structure
- 30% Advance upon formal purchase order release & engineering drawing approval
- 40% Milestone Release upon successful live Factory Acceptance Test (FAT) under full operational load
- 20% Milestone Release upon physical site delivery at Sarangpur Industrial Cluster, Chandigarh
- 10% Final Retention released post-SAT commissioning and continuous 7-day trial run
- Mandatory 12-Month Comprehensive Guarantee + 24-Month Critical Spares commitment
DIRECT ITEM TENDER
Quote for SAI-EQ-37
Submit your commercial proposal directly to the Directorate of Procurement.