📢
MANDATORY QUOTATION REQUIREMENT: When quoting for this item, your quotation document must clearly display the code SAI-EQ-40 in BOLD.
SAI-EQ-40 Division 5 to 10: Plant Utilities, Cold Chain, QA Lab, IT & Coding
OPEN

SAI-EQ-40 — Cleanroom Environmental IoT Telemetry, Air Quality & Differential Pressure Monitor Matrix

📍 Destination: Sarangpur Cleanroom Hub & Nayagaon Bay, Chandigarh Tricity
⚖️ Capacity: Multi-zone wall-mount IoT telemetry matrix (12 sensor nodes) logging temperature, RH, differential pressure & PM2.5/PM10
🚀 Phase: Phase 1 (Day-1)
⏳ Deadline: Rolling Procurement • Active 2026 Lot
💡 ADDITIONAL INFO (FLEXIBLE PARAMETERS & VENDOR ALTERNATIVES)
Sensor nodes communicate over Modbus RTU or industrial Wi-Fi to the local LLM/ERP server (SAI-EQ-39). Real-time cleanroom temperature (target: 20-22°C) and pressure (+15 Pa) data streams directly to public customer verification dashboard.
🔬 REGULATORY & QUALITY SPECIFICATION BENCHMARK
Factory-calibrated digital sensors; 21 CFR Part 11 compliant audit trail; real-time telemetry streaming to local ERP and /verify-batch/

Comprehensive Technical & Commercial Specifications

Asset / Item Code SAI-EQ-40
Department / Division Division 5 to 10: Plant Utilities, Cold Chain, QA Lab, IT & Coding
Technical Capacity Multi-zone wall-mount IoT telemetry matrix (12 sensor nodes) logging temperature, RH, differential pressure & PM2.5/PM10
Metallurgy & Material IP65 wipe-down sanitary polycarbonate and SS-304 wall-plate enclosures, RS485 Modbus / MQTT protocol
Power / Drive Rating 0.15 kW (Central 24V DC industrial power supply with battery backup)
Deployment Phase Phase 1 (Day-1)
Quality Standard Factory-calibrated digital sensors; 21 CFR Part 11 compliant audit trail; real-time telemetry streaming to local ERP and /verify-batch/
Delivery Destination Sarangpur Industrial Cluster, Chandigarh – 160014
Payment Milestone 30% Advance | 40% Live FAT | 20% Physical Delivery | 10% Final SAT Retention
Commercial Guarantee 12-Month Comprehensive Guarantee + 24-Month Critical Spares Commitment

Commercial Terms & Settlement Milestone Structure

  • 30% Advance upon formal purchase order release & engineering drawing approval
  • 40% Milestone Release upon successful live Factory Acceptance Test (FAT) under full operational load
  • 20% Milestone Release upon physical site delivery at Sarangpur Industrial Cluster, Chandigarh
  • 10% Final Retention released post-SAT commissioning and continuous 7-day trial run
  • Mandatory 12-Month Comprehensive Guarantee + 24-Month Critical Spares commitment
DIRECT ITEM TENDER

Quote for SAI-EQ-40

Submit your commercial proposal directly to the Directorate of Procurement.

Need urgent technical clarification? WhatsApp us directly at +917696788811